Launch planning · TN

Pleasant Grove Day Use Area

Celina, Clay County, Tennessee · Dale Hollow Reservoir

Plan a launch at Pleasant Grove Day Use Area

Pleasant Grove Day Use Area is mapped on Dale Hollow Reservoir in Celina, Clay County, Tennessee. Use the recorded facilities below to match your craft, crew and parking needs, then compare the nearby options before choosing a launch.

  • Agency boat-size category: Up to 26 ft. This is an inventory classification, not a current depth or safe-size measurement.
  • One launch lane is recorded. Prepare gear away from the lane and have a retrieval plan so staging does not block other users.

Vessel notes reflect agency rules or classifications, not a measurement taken at this launch.

Build a printable plan for this launch →

Recorded facilities and access

Agency record retrieved 2026-10-21. Other fields may retain the original 2026-07-06 inventory values. A retrieval date is not a same-day inspection or a revision date for every field. View the source record ↗

Which details were checked in this source?

surface, lanes, parking, trailer parking, dock, restrooms, approach notes, waterbody, owner, agency, fee required, hours, vessel notes.

Launch type
Boat Launch
Surface
Concrete
Launch lanes
1
Trailer parking spaces
Greater than 25
Parking
Paved
Dock
Yes
Restrooms
Yes
Accessibility
Yes
Lighting
Yes
Recorded hours
24-hour access recorded
Season
no
Managing organization
USACE
Owner
USACE
Launch fee
Fee recorded
Vehicle parking category
Greater Than 25 recorded; separate from the trailer-parking field.

Compare nearby launch options

These alternatives are selected by the mapped coordinates, with matching waterbody names first. Distances are straight-line miles, not road mileage, travel time or a navigable connection.

LaunchWaterbody / distanceCraft / surface / lanesTrailer spaces / fee
Horse Creek ResortSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my planDale Hollow Reservoir2.1 mi · matching waterbody nameBoat LaunchConcrete · 1 lane(s) recorded11-24No fee recorded
Holly Creek DockSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my planDale Hollow Reservoir4.1 mi · matching waterbody nameBoat LaunchConcrete · 2 lane(s) recorded5-10Fee recorded
LilydaleSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my planDale Hollow Reservoir9.0 mi · matching waterbody nameBoat LaunchConcrete · 1 lane(s) recorded11-24Fee recorded
Cove CreekSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my planDale Hollow Reservoir12.6 mi · matching waterbody nameBoat LaunchConcrete · 1 lane(s) recorded11-24No fee recorded

Before leaving home

Confirm current closures, water level or tide, legal access, payment and posted vessel restrictions with the operator. A missing value means unknown. A negative or zero value means the inventory explicitly recorded it; neither confirms today’s conditions.

Work through the ramp-selection guide · Save the launch-day checklist