Pine Lake
Henderson County, Tennessee · Pine Lake
Plan a launch at Pine Lake
Pine Lake is mapped on Pine Lake in Henderson County, Tennessee. Use the recorded facilities below to match your craft, crew and parking needs, then compare the nearby options before choosing a launch.
- Agency boat-size category: Up to 26 ft. This is an inventory classification, not a current depth or safe-size measurement.
Vessel notes reflect agency rules or classifications, not a measurement taken at this launch.
Recorded facilities and access
Agency record retrieved 2026-10-21. Other fields may retain the original undated inventory values. A retrieval date is not a same-day inspection or a revision date for every field. View the source record ↗
Which details were checked in this source?
surface, lanes, parking, trailer parking, dock, restrooms, approach notes, waterbody, owner, agency, fee required, hours, vessel notes.
- Launch type
- Boat Launch
- Surface
- Concrete
- Launch lanes
- 2
- Trailer parking spaces
- 11-24
- Parking
- Paved
- Dock
- Yes
- Restrooms
- Yes
- Accessibility
- Yes
- Lighting
- Yes
- Recorded hours
- 24-hour access recorded
- Season
- no
- Managing organization
- TVA
- Owner
- TVA
- Launch fee
- No fee recorded
- Vehicle parking category
- Greater Than 25 recorded; separate from the trailer-parking field.
Agency approach notes: Pine Lake Rd, Lexington, TN
Compare nearby launch options
These alternatives are selected by the mapped coordinates, with matching waterbody names first. Distances are straight-line miles, not road mileage, travel time or a navigable connection.
| Launch | Waterbody / distance | Craft / surface / lanes | Trailer spaces / fee |
|---|---|---|---|
| Sycamore LakeSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my plan | Sycamore Lake1.8 mi · different or unknown waterbody | Boat LaunchConcrete · 1 lane(s) recorded | 5-10No fee recorded |
| Beech LakeSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my plan | Beech Lake6.7 mi · different or unknown waterbody | Boat LaunchConcrete · 2 lane(s) recorded | Greater Than 25No fee recorded |
| Pin Oak LakeSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my plan | Pin Oak Lake10.6 mi · different or unknown waterbody | Boat LaunchConcrete · 2 lane(s) recorded | 11-24No fee recorded |
| Red Bud LakeSource ↗ · retrieved 2026-10-21Current operating status unconfirmedUse as a backup candidate in my plan | Red Bud Lake11.8 mi · different or unknown waterbody | Boat LaunchConcrete · 1 lane(s) recorded | 5-10No fee recorded |
Before leaving home
Confirm current closures, water level or tide, legal access, payment and posted vessel restrictions with the operator. A missing value means unknown. A negative or zero value means the inventory explicitly recorded it; neither confirms today’s conditions.
Work through the ramp-selection guide · Save the launch-day checklist
