DeTour Village
Chippewa County, Michigan · Saint Marys River
Plan a launch at DeTour Village
DeTour Village is mapped on Saint Marys River in Chippewa County, Michigan. Use the recorded facilities below to match your craft, crew and parking needs, then compare the nearby options before choosing a launch.
- Hard-surfaced ramp; the agency design category accommodates most trailerable craft. Design depth is not a current depth measurement.
Vessel notes reflect agency rules or classifications, not a measurement taken at this launch.
Recorded facilities and access
Agency record retrieved 2026-10-03. Other fields may retain the original 2024-04-25 inventory values. A retrieval date is not a same-day inspection or a revision date for every field. View the source record ↗
Which details were checked in this source?
accessible, surface, ramp type, vessel notes, agency, phone, lanes, trailer parking, dock, restrooms.
- Launch type
- Trailer launch
- Surface
- Hard surface
- Launch lanes
- 2
- Trailer parking spaces
- 39
- Dock
- 1
- Restrooms
- Restroom facilities recorded
- Managing organization
- DeTour State Harbor
- Owner
- DNR-PRD
Compare nearby launch options
These alternatives are selected by the mapped coordinates, with matching waterbody names first. Distances are straight-line miles, not road mileage, travel time or a navigable connection.
A parking tradeoff: Conely Point has 41 recorded trailer spaces compared with 39 here, and is 21.8 miles away in a straight line. It carries the same waterbody label; verify the road approach and present access before using it as a backup.
| Launch | Waterbody / distance | Craft / surface / lanes | Trailer spaces / fee |
|---|---|---|---|
| Conely PointSource ↗ · retrieved 2026-10-03Current operating status unconfirmedUse as a backup candidate in my plan | Saint Marys River21.8 mi · matching waterbody name | Trailer launchHard surface · 2 lane(s) recorded | 41 spacesUnknown |
| DeTour PassageSource ↗ · retrieved 2026-10-03Current operating status unconfirmedUse as a backup candidate in my plan | Lake Huron1.2 mi · different or unknown waterbody | Trailer launchHard surface · 2 lane(s) recorded | 17 spacesUnknown |
| Caribou LakeSource ↗ · retrieved 2026-10-03Current operating status unconfirmedUse as a backup candidate in my plan | Caribou Lake4.9 mi · different or unknown waterbody | Trailer launchHard surface · 1 lane(s) recorded | 11 spacesUnknown |
| Maxton BaySource ↗ · retrieved 2026-10-03Current operating status unconfirmedUse as a backup candidate in my plan | Lake Huron11.0 mi · different or unknown waterbody | Trailer launchHard surface · 1 lane(s) recorded | 23 spacesUnknown |
Before leaving home
Confirm current closures, water level or tide, legal access, payment and posted vessel restrictions with the operator. A missing value means unknown. A negative or zero value means the inventory explicitly recorded it; neither confirms today’s conditions.
Work through the ramp-selection guide · Save the launch-day checklist
